188 MW of Grid Connection Capacity
Ready for Your Wind Farm
Two independent, transferable packages of secured grid connection conditions, 94 MW each, in a region with excellent wind resource in north-eastern Poland. A ready foundation to independently develop a wind farm project, without waiting in the grid connection queue.

Advantages of the offered connection conditions
188 MW of grid connection capacity split into two independent packages, ready as the foundation for independent project development.
2 independent connection packages
Two fully independent, transferable packages of secured grid connection conditions, fully transferable to the buyer's own target project location.
Secured grid connection conditions
Grid connection conditions issued in December 2025 and valid for 24 months, until December 2027, so development can start without waiting in the grid connection queue.
Strategic location
Ełk region with excellent wind resource and access to established transmission infrastructure.
Strong market fundamentals
Growing demand for RES grid connection capacity and a supportive regulatory environment in Poland.
Flexibility to change substation location
The leased land served solely as a formal requirement to secure the conditions with the grid operator — it is not the target site of the farm. The conditions can be transferred to the buyer's own project by changing the connection point location.
Private DSO opportunity
Potential to establish a private distribution network structure, giving the buyer greater control and room for further expansion.
Cable pooling potential
Opportunity to integrate additional RES capacity through cable pooling, maximizing use of the allocated connection capacity.
BESS integration upside
Co-location potential for BESS on the same connection, enhancing flexibility and the future project's value.
Two independent grid connection packages
PACKAGE APackage A · 94 MW
- Connection to Ełk Bis 400/110 kV substation
- Access to National Transmission Grid (PSE)
- Connection cost: PLN 14,028,000
- Independent structure, can be sold separately
- Conditions fully transferable to the buyer's target wind farm project location
PACKAGE BPackage B · 94 MW
- Connection to Wigry 110 kV substation
- Integration into regional distribution network
- Connection cost: PLN 8,646,000
- Independent structure, can be sold separately
- Potential to build a private DSO platform
Ełk region, north-eastern Poland
Package A: 94 MW
94 MW, Ełk Bis 400/110 kV substation
Package B: 94 MW
94 MW, Wigry 110 kV substation
Ełk
Major regional hub
Wigry
Recognized regional landmark
What can be built on top of these connection conditions
Wind farm
Potential to build a wind farm of up to 94 MW on top of the secured connection.
Grid flexibility
Flexibility to change the connection point and grid configuration during further development.
Storage upside
BESS integration on the same connection, enhancing flexibility and project returns.
Private DSO opportunity
Potential to establish a private DSO platform and own infrastructure.
Cable pooling potential
Integrate additional renewable projects via the shared connection.
Ancillary services & revenues
System services and BESS as additional revenue streams once the farm is operational.
Frequently asked questions
What exactly is being sold?
The transaction covers the entire special purpose vehicle holding the grid connection conditions. The connection conditions are fully transferable, and the land is secured through a lease agreement.
What is the cost and validity period of the connection conditions?
The grid connection conditions were issued in December 2025 and are valid for 24 months, until December 2027. The connection cost is PLN 14,028,000 for the Ełk package (Ełk Bis 400/110 kV substation) and PLN 8,646,000 for the Wigry package (Wigry 110 kV substation).
Can the connection point location be changed after purchase?
Yes. The connection conditions allow the connection point to be optimized during further project development, without losing the secured capacity.
Will the wind farm be built on the leased land?
No. The leased land served solely as a formal requirement to secure the connection conditions with the grid operator, and is not part of the offer or the target site of the farm. We do not offer land for lease for RES purposes — the transaction covers exclusively the transferable grid connection conditions, which the buyer relocates to their own target project.
Is this offer exclusive?
Until an exclusivity agreement is signed, we hold discussions in parallel with multiple interested parties. For buyers ready to move quickly, we can offer short-term exclusivity during due diligence.
Why are you selling these conditions instead of building the wind farm yourselves?
Our business model is built on capital recycling. We secure grid connection conditions at an early development stage, then hand them over to developers ready to carry out the next phase of construction, freeing up capital for new projects.
Are the land or connection conditions subject to any disputes or claims?
No. Both the leased land and the connection conditions are free of disputes, encumbrances, and third-party claims. This land is only a formal security for the conditions — it is not for sale and is not the target site of the investment.
Let's talk about acquiring these grid connection conditions
Fill in the form to receive a technical teaser on the connection conditions and schedule a call with the project team.
Contact details
We respond within 1–2 business days. All materials are shared on a confidential basis.